How to Design a Kids’ Hub Indoor Playground and Family Entertainment Center

The kid’s hub indoor playground and family entertainment hub
below you will find brief information about the site and the proposed floor plan

Kids' Hub Indoor Playground and Family Entertainment Center Design

Proposed Building site

Proposed Building Site

Create and design a complete Architectural drawing and 3D modeling and create a material list for all materials needed with quantities (KG, m3, or M2) for the flowing mixed-use commercial and residential building as per the description below
Building size +/- (60 m by 85m) Building height +/-15 m The proposed building consists of a Basement, main floor ( section mezzanine %30), and second floor
All work of preparing the site and concrete work, utility connections, site survey, and other related work for site preparation will be all our responsibility

1- Basement area, the basement will be on the whole building footprint and will be +/-10.5 F (+/-3.2 m) high.

2- Part of the Basement wall will be above the ground level 4 feet and 6 inches to allow for windows to allow for natural light (window size will be +/-30’’ by 8’ ) double sealed with aluminum frame 6mm+12A+6mm tempered glass or wire glass ( windows will be 10 m apart from each other all around the building.

3- Every 25 m will have an access/ exit door to the basement (double metal door with screen glass fire rated and with push par/ panic bar for fire escape Also at the door we will have another area (8f*8f a farmed to the ceiling with glass a door from each side as an entry point) to this section of the basement.

4- Will have 2 rooms around 1000SQF each (one at the front, one at the back) as mechanical room for easy connection and wiring, or (another option) one mechanical room in the middle of the basement to hold the water meter, gas meter electrical meter, boiler electrical panels and other utility equipment.

5- Basement walls will be made of ICF concrete forms (6’’ wide with 2.5’’ EPS insulation from each side and inside the ICF will be lightweight cellular concrete to increase the wall integrity and insulation when it comes to the load-bearing colon or pilers this one will be just regular concrete to increase the building integrity and give more support to the roof, the roof of the basement will be metal corrugated sheets and on the top of the metal sheet will pour lightweight cellular concrete mixed with fiberglass and boards of EPS foam concrete sheets (6’’ thickness).

6- The basement should have a truck loading door from the back with a ramp for trucks loading and unloading.

7- the HAVC pipe will be running under the basement roof to provide heating and cooling for the basement as well as the main floor, all light fixtures will be LED lights 2f*4f CSA-certified.

8- All work of preparing the site and concrete work will be our responsibility

Main floor (ground floor)

Kids' Hub Indoor Playground and Family Entertainment Center Main Floor (ground floor)

Will be 27F high and will consist of two sections.

1- The first section will be the entrance area and will be on a 15000 SQF area Height will be 15F high(floor to roof) and will have a flowing

A- Reception area and ticket desk, lockers

B- Kitchen area (1000 sqm) and food court 1000 sqm area

C- Washroom (men’s washroom ( two adult size and 4 children size toilets and 4 urinals ) and (ladies washroom 4 ladies size and 6 children size toilets) one handicapped washroom in each section )

D- Computer games and VR section

E- Speedy car track

F- Interactive play and music play area.

2- The second section will be designated to the big and tall play structures like (slides, ninja courses, climbing walls, inflatables, and other play structures, this section will be an open area to allow for maximum use and arrangement of the play structures ( please note, this part for information only)

3- The building wall will be PU sandwich panels (horizontal stacks) .6 to .8 mm of Aluminum panels from the outside and .7 or .8mm of metal panels from the inside with 150 or 200 mm of PU insulations (with all cladding system, mounting brackets, and accessories) please note that (snow load in the winter time around 50 to 75 cm high and the temperature drops to below -50C and wind speed max 100 to 120 km/h)

4- Every 10 m will have a 3f by 8f glass window (20f high) (same windows descriptions as the basement windows)

5- Every 25m will have an exit door for a fire escape with a push bar or panic par and screen glass (fire-rated door (metal)

6- The entrance door will be an automatic double sliding door with aluminum farm and double security glass (6mm+12A+6mm) leading to the entrance area which will be farmed aluminum frame with double glass sealed units (20f*20f) leading to the main entrance door for more weather protection

7- The floor will have a 3mm epoxy anti-slip finish

8- If possible, some windows can have an opening door to let more fresh air / protective galvanized wire mesh frame be added for bug protection, all-aluminum frames to be commercial grade glazed frames

9- All doors and windows will have weather-protection rubber seals

10- There will be Two sets of metal stairs leading to the second floor (mezzanine) & third floor from each side of the building (the main entrance side will have stairs only, the other side will have stairs and an elevator)

Mezzanine area

Kids' Hub Indoor Playground Mezzanine Area

This area will be on the top of the first section of the main floor (where is the reception and kitchen area) and will be a total of 15000 SQF in height from floor to ceiling +/- 10.5 f and will be designated to be an office and party room and different activities room
Please consider making space for a washroom (2 men and two ladies) kitchen area lobby and reception area
This floor will be facing the main st and will be part as sandwich panels and part as double sealed temper glass 6mm +12A+66 windows) on the whole facing.

Third floor

Kids' Hub Indoor Playground and Family Entertainment Center Third floor

Will be just on the top of the mezzanine and will have one big condo unit of 6000 SQF on two levels that will consist of
1- 6 + bedrooms (with full washroom and closets)
2- Kitchen, dining room
3- Home Office Space
4- Big living room
5- Laundry
6- Reception room with Guest washroom attached
7- Storage spaces and closets
8- The kitchen to have an open concept in the dining room
9- Access door to the patio and setting area with shade on the patio

The roof will be sandwiching panels with PU insulation .8mm metal from both sides
On the top of the roof, we are planning to install solar panels to provide the building with the electricity required for operation and lighting

The list of the materials /items needed to construct this building envelope (steel structure, walls, windows, doors, roof, all metal sheets, sandwich panels, and all other required materials to complete this building envelop )